1. RESIDUAL WATER PUMP

    Three phase water pump sewage.

    News.

    2 units.

    3.000 euros/ud.
  2. FENCE GALVANIZED NEW

    Fences galvanized of 3 5 x 2 meters for the boundary mark of a terrain or works and impede the step ( transport non-included ).

    20€
  3. BALUSTRADES OF SECURITY

    Balustrades of security for works, measured: 1. 46 in length x 1. 02 alto.Lot of 360 units

    4€
  4. ELEVATING BIGMAT

    Elevador BIGMAT 300 kiloes. It includes prop. Totally revised.

    400€
  5. DEPOSIT OF COMBUSTIBLE

    I place to transport gasoil with gas station to 12 volts. Capacitance 200 liters. Completely revised. 

    395 €
  6. CUTTING DURHER RODS

    Cutting for DURHER rod with electric motor. Totally revised. 

    1200 €